Project´s Economic Scope: 1.8 millones de euros
Year of Project: 2005 – 2007
Project: The symmetrical high availability was designed between the two main centers of the company, between Ciudad del Ebro and Zaragoza city. The network of the centers was based on 4 catalyst 6509, 30 switches 3750, callmanger 7 in cluster, redundant connection by two radio links and connection by mpls through telephone as a third option, network design, addressing and connection of companies subsidiaries through mpls vpns, wifi network design with controllers for 800 distributed access points, waas implementation between two centers for wam optimization.