04 Mar
- Mar 04, 2017
- Mira
- 0
Year of Project: 2018.
Project: Deployment and configuration of the UCS Manager solution, the implementation consisted of 3 5108 chassis with 24 Blade servers interconnected through a cluster of 2 Fabric Interconnect switches, 6248 connected to the LAN network using Nexus 5000 switches and connected to the SAN network composed of two MDS 9000 series switches and two NetApp disk controllers.