Saica

01 Feb


Project´s Economic Scope: 1.8 millones de euros

Year of Project: 2005 – 2007

Project: The symmetrical high availability was designed between the two main centers of the company, between Ciudad del Ebro and Zaragoza city. The network of the centers was based on 4 catalyst 6509, 30 switches 3750, callmanger 7 in cluster, redundant connection by two radio links and connection by mpls through telephone as a third option, network design, addressing and connection of companies subsidiaries through mpls vpns, wifi network design with controllers for 800 distributed access points, waas implementation between two centers for wam optimization.